• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 18. Preventive Maintenance Checks and Services (PMCS) - During - Model M1089A1. - Continued - TM-9-2320-392-10-20570
Table 18. Preventive Maintenance Checks and Services (PMCS) - During - Model M1089A1. - Continued - TM-9-2320-392-10-20572

TM-9-2320-392-10-2 M1083A1 Series 5-Ton 6x6 Medium Tactical Vehicles (MTV) Manual
Page Navigation
  505    506    507    508    509  510  511    512    513    514    515  
TM 9-2320-392-10-2
M1083A1 SERIES PREVENTIVE MAINTENANCE
0103 00
CHECKS AND SERVICES (PMCS) - Continued
Table 18. Preventive Maintenance Checks and Services (PMCS) - During -
Model M1089A1 - Continued.
ITEM
INTERVAL
MAN-
ITEM
CREWMEMBER
EQUIPMENT
NO.
HOUR
TO BE
PROCEDURE
NOT READY/
CHECKED
AVAILABLE
OR
IF:
SERVICED
3
During
Material
Handling
Crane
(MHC)
REMOTE
CONTROL
UNIT -
Continued
WARNING
Keep boom clear of all electrical lines and other obstacles while
operating Material Handling Crane (MHC). Failure to comply may
result in serious injury or death to personnel.
Area must be clear of personnel before rotating or telescoping
boom. Boom must be rotated and telescoped slow enough so
Operator has control of load. If Operator cannot see load during
operation, operate Material Handling Crane (MHC) with REMOTE
CONTROL UNIT.  Failure to comply may result in serious injury or
death to personnel.
CAUTION
Keep hook assembly at least 2 ft (0.61 m) from end of boom. If hook
assembly hits end of boom, M1089A1 Material Handling Crane (MHC) will
lose power for several seconds. Failure to comply may result in damage to
equipment.
0103 00-209






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.