TM 9-2320-392-10-1
M1090A1 DUMP COVER KIT
0028 00
INSTALLATION/REMOVAL - Continued
SOFT TOP KIT (STEEL BOWS) INSTALLATION - Continued
8.
Position center bow (9) in center dump body pockets (10).
9.
Position rear bow (11) in rear dump body pockets (12) with rear bow brackets (13)
facing toward rear of vehicle.
NOTE
Left and right sides of front, center, and rear bows are secured the same
way. Right side shown.
10. Position three tiedown straps (4) on J-hook (14) with three tri-rings (15).
11. Tighten three tiedown straps (4).
12. Perform steps 10 and 11 on left side.
0028 00-3