TM 9-2320-366-20-4
(8) Close cover (12) on junction box (13).
(9) Tighten four screws (14) on junction box (13).
(10) Connect connector (15) to swing CW solenoid (16).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate MHC and check swing CW operation (TM 9-
2320-366-10-2).
End of Task.
7-595