TM 9-2320-272-24-3
4-212. TRANSMISSION POWER TAKEOFF (PTO) MAINTENANCE (Contd)
7.
Using arbor press, install output bearing (4) on output side of output shaft (10) until seated on
output gear (13).
NOTE
For correct bearing cap installation, ensure arrow on input
bearing cap points toward shifter cover opening. Once positioned,
the output bearing cap can be correctly installed.
8.
Install new gasket(s) (15) and input bearing cap (1) on unmarked side of PTO housing (7) with four
screws (14). Tighten screws (14) 8-10 lb-ft (11-14 Nm).
9.
Install new gasket(s) (16) and output bearing cap (3) on marked side of PTO housing (7) with four
screws (17). Tighten screws (17) 8-10 lb-ft (11-14 Nm).
4-997