TM 9-2320-272-24-3
FOLLOW-ON TASKS:
Install boom floodlight wire (para. 3-385).
Fill hydraulic oil reservoir to proper level (LO 9-2320-272-12).
Lubricate boom (LO 9-2320-272-12).
0perate boom through full range of motion (TM 9-2320-272-10) and check for
leaks and proper movement.
4-915