TM 9-2320-272-24-3
4-161. ELECTRICAL LOAD CENTER BOX MAINTENANCE (Contd)
d. Installation
Install load center (3) on van body (4) and conduit (5) with four washers (2), screws (1), and
1.
special nut (6).
Install left 3-phase receptacle wiring harness (8) and three wires (13) in load center (3) and on triple
2.
circuit breaker (11) with three screws (12).
Install wire (9) on neutral buss bar (10) with screw (7).
3.
4-784