TM 9-2320-272-24-3
4-143. CARGO BODY FRAME RAIL SILL MAINTENANCE
d. Installation
1.
Position frame rail sill (4) on cargo body (5).
2.
Install frame rail sill (4) on cargo body (5) with ten screws (3), lockwashers (2), and nuts (1),
ensuring heads of screws (3) rest in sill of counterbore. Tighten nuts (1) 100-110 lb-ft (11-12 Nm).
4-725