TM 9-2320-272-24-2
4-34. INJECTOR PLUNGER AND VALVE ADJUSTMENTS (TORQUE METHOD) (Contd)
FOLLOW-ON TASKS: Install rocker lever housing covers (para. 4-32).
l Connect battery ground cables (para. 3-126).
l Push in fuel shutoff handle (TM 9-2320-272-10).
l Start engine (TM 9-2320-272-10), run until normal operating temperature is
reached, and check for leaks.
4-259