• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation - TM-9-2320-272-24-10930
SECONDARY AIR RESERVOIR (SUPPLY TANK) REPLACEMENT

TM-9-2320-272-24-1 Truck 5-Ton 6x6 M939 M939A1 M939A2 Series Trucks (Diesel) Manual
Page Navigation
  909    910    911    912    913  914  915    916    917    918    919  
TM 9-2320-272-24-1
3-202. PRIMARY AIR RESERVOIR (SUPPLY TANK) REPLACEMENT (Contd)
FOLLOW-ON TASKS:  l  Install primary low air pressure switch (para. 3-99).
l Install toolbox and step (para. 3-302).
l Start engine (TM 9-2320-272-10) and allow air pressure to build to normal
operating range. Check for air leaks at primary air reservoir. Road test vehicle.
3-565






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.