• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRAKE PROPORTIONING VALVE REPLACEMENT (Contd)
WET AIR RESERVOIR (SUPPLY TANK) AND BRACKET REPLACEMENT (Contd) - TM-9-2320-272-24-10915

TM-9-2320-272-24-1 Truck 5-Ton 6x6 M939 M939A1 M939A2 Series Trucks (Diesel) Manual
Page Navigation
  892    893    894    895    896  897  898    899    900    901    902  
TM 9-2320-272-24-1
3-200. WET AIR RESERVOIR (SUPPLY TANK) AND BRACKET REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
All except M936/A1/A2
TM 9-2320-272-10
TM 9-2320-272-24P
TOOLS
General mechanic's tool kit (Appendix E, Item 1) EQUIPMENT CONDITION
l Parking brake ret (TM 9-2320-272-10).
MATERIALS/PARTS
l Air reservoirs drained (TM 9-2320-272-10).
Eight locknuts (Appendix D, Item 291)
GENERAL SAFETY INSTRUCTIONS
Antiseize tape (Appendix C, Item 72)
Do not disconnect air lines before draining air
reservoirs.
WARNING
Do not disconnect air lines before draining air reservoirs. Small
parts under pressure may shoot out with high velocity, causing
injury to personnel.
a. Removal
NOTE
Tag air liner for installation.
1.
Disconnect drain line (12) from adapter (11).
2.
Disconnect primary tank air line (14) from elbow (13).
3.
Disconnect auxiliary air line (1) from elbow (2).
4.
Disconnect trailer emergency air line (6) from elbow (3).
5.
Disconnect secondary tank air line (4) from adapter (5).
6.
Disconnect supply tank input air line (15) from elbow (16).
7.
Remove four locknuts (8), two U-bolts (7), and supply tank (9) from two support brackets (10).
Discard locknuts (8).
8.
Remove four locknuts (18), screws (17), and two support brackets (10) from frame brace (19).
Discard locknuts (18).
3-548






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.