• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSFER CASE FRONT AXLE ENGAGEMENT CONTROL VALVE REPLACEMENT cont'd
TRANSMISSION MODULATOR AND CABLE MAINTENANCE (Contd) - TM-9-2320-272-24-10765

TM-9-2320-272-24-1 Truck 5-Ton 6x6 M939 M939A1 M939A2 Series Trucks (Diesel) Manual
Page Navigation
  743    744    745    746    747  748  749    750    751    752    753  
TM 9-2320-272-24-1
3-145. TRANSMISSION MODULATOR AND CABLE MAINTENANCE
THIS TASK COVERS:
c. Adjustment
a Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
All
LO 9-2320-272-12
TM 9-2320-272-10
TOOLS
TM 9-2320-272-24P
General mechanic's tool kit (Appendix E, Item 1)
EQUIPMENT CONDITION
Torque wrench (Appendix E, Item 144)
l Parking brake set (TM 9-2320-272-10).
MATERIALS/PARTS
l Left splash shield removed (TM 9-2320-272-10).
O-ring (Appendix D, Item 454)
Locknut (Appendix D, Item 276)
Two locknuts (Appendix D, Item 283)
Locknut (Appendix D, Item 284)
a. Removal
NOTE
Have drainage container ready to catch oil.
Remove screw (15), retaining bracket (14), modulator (17), and O-ring (16) from transmission (13).
1.
Discard O-ring (16).
Remove locknut (22), screw (19), speedometer cable clamp (18), and modulator cable clamp (20) from
2.
transmission bracket (21). Discard locknut (22).
Remove modulator return spring (8) from modulator link (9) and bracket (2).
3.
Remove two locknuts (3), screws (7), clamp (6), and shim (5) from bracket (2). Discard locknuts (3).
4.
Remove locknut (1), screw (10), modulator link (9), and modulator cable (4) from throttle lever (11)
5.
on fuel pump (12). Discard locknut (1).
Remove modulator link (9) from modulator cable (4).
6.
3-398






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.