• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY GROUND CABLE MAINTENANCE (Contd)
SLAVE RECEPTACLE REPLACEMENT (Contd)

TM-9-2320-272-24-1 Truck 5-Ton 6x6 M939 M939A1 M939A2 Series Trucks (Diesel) Manual
Page Navigation
  686    687    688    689    690  691  692    693    694    695    696  
TM 9-2320-272-24-1
3-127. SLAVE RECEPTACLE REPLACEMENT
THIS TASK COVERS:
b. Installation
a. Removal
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
TM 9-23201272-10
All
TM 9-2320-272-24P
TOOLS
General mechanic's tool kit (Appendix E, Item 1)
Parking brake set (TM 9-2320-272-10).
l
MATERIALS/PARTS
Battery ground cables disconnected (para. 3-126).
l
Two lockwashers (Appendix D, Item 354)
GENERAL SAFETY INSTRUCTIONS
l  Remove all jewelry before performing procedure.
l  Disconnect battery cables before removing slave
receptacles.
WARNING
Remove all jewelry. If jewelry or disconnected battery ground
l
cable contacts battery terminal, a direct short will result and
may cause injury to personnel.
Do not remove slave receptacle before disconnecting battery
l
ground cables. If energized battery cable contacts cab, a direct
short will result and may cause injury to personnel.
1.
Remove four nuts (7), screws (10), rope (9), and cover (11) from cab (6).
NOTE
Insulating hose remains inside cab.
2.
Pull slave receptacle (12) until battery cables (3) and (8) are exposed.
3.
Remove two screws (1), lockwashers (2), and battery cables (3) and (8) from slave receptacle (12).
Discard lockwashers (2).
4.
Remove insulator (5) and gasket (4) from slave receptacle (12).
5.
Pull cables (3) and (8) clear of insulating hose (13) and remove from battery box (14).
1.
Route cables (3) and (8) through insulating hose (13) and battery box (14).
2.
Pull cables (3) and (8) through insulating hose (13) until exposed outside cab (6).
3.
Install gasket (4) and insulator (5) on slave receptacle (12).
4.
Install battery cables (3) and (8) on slave receptacle (12) with two new lockwashers (2) and screws (1).
5.
Insert slave receptacle (12) in cab (6) and position insulating hose (13) over screws (1). Install slave
receptacle (12) with three screws (10) and nuts (7).
6.
Install cover (11) and rope (9) on slave receptacle (12) with screw (10) and nut (7).
3-340






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.