• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SURGE TANK, RADIATOR VENT HOSE, MANIFOLD RETURN HOSE (M939/A1) REPLACEMENT cont'd - TM-9-2320-272-24-10549
SURGE TANK AND BRACKET (M939A2) REPLACEMENT cont'd

TM-9-2320-272-24-1 Truck 5-Ton 6x6 M939 M939A1 M939A2 Series Trucks (Diesel) Manual
Page Navigation
  530    531    532    533    534  535  536    537    538    539    540  
TM 9-2320-272-24-1
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
M939A2
TM 9-2320-272-10
TM 9-2320-272-24P
TOOLS
EQUIPMENT CONDITION
General mechanic's tool kit (Appendix E, Item 1)
Parking brake set (TM 9-2320-272-10).
MATERIALS/PARTS
Hood raised and secured (TM 9-2320-272-10).
Two locknuts (Appendix D, Item 279)
Cooling system drained as required (para. 3-53).
Tiedown straps (Appendix D, Item 685)
Exhaust pipe removed (para. 3-50).
Antiseize tape (Appendix C, Item 72)
NOTE
Remove tiedown straps as necessary. Note location for installation.
1.
Loosen clamp (18) and disconnect hose (17) from surge tank (3).
2.
Loosen clamp (16) and disconnect hose (14) from surge tank (3).
3.
Loosen clamp (12) and disconnect hose (13) from surge tank (3).
4.
Remove fitting (4) from surge tank (3).
5.
Disconnect hose (11) from surge tank (3).
6.
Remove two locknuts (6), washers (5), screws (24), nuts (7), clamps (23), surge tank (3), and two
seats (22) from bracket (20). Discard locknuts (6).
7.
Remove cap (2), chain (1), and S-hook (25) from surge tank (3).
8.
Remove two screws (19), screw (10), and bracket (20) from engine (15).
9.
Remove nut (9), screw (21), and bracket (8) from bracket (20).
1.
Install S-hook (25), chain (1), and cap (2) on surge tank (3).
2.
Install bracket (8) on bracket (20) with screw (21) and nut (9). Do not tighten nut (9).
3.
Install bracket (8) and (20) on engine (15) with two screws (19) and screw (10).
4.
Position two seats (22) on bracket (20).
5.
Position two clamps (23) on surge tank (3) and install clamps (23) and surge tank (3) on bracket (20)
with two screws (24), nuts (7), washers (5), and new locknuts (6).
6.
Connect hose (14) on surge tank (3) and tighten clamp (16).
7.
Connect hose (17) to surge tank (3) and tighten clamp (18).
NOTE
Male pipe threads must be wrapped with antiseize tape before
installation.
3-184






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.