TM 9-2320-260-34-1
3-58. FLYWHEEL HOUSING INSTALLATION
THIS TASK COVERS:
a. Installation
b. Alinement
lNITIAL SETUP
MATERIALS/PARTS
APPLICABLE MODELS
Gasket (Appendix D, Item 75)
All
Gasket (Appendix D, Item 77)
TOOLS
Nine packings (Appendix D, Item 305)
General mechanic's tool kit
Chalk (Appendix C, Item 7)
(Appendix B, Item 1)
Dial indicator attachment
Antiseize tape (Appendix C, Item 50)
(Appendix B, Item 85)
REFERENCES (TM)
Dial indicator (Appendix B, Item 11)
TM 9-2320 -260-34P-1
Soft-head hammer (Appendix B, Item 47)
(Appendix B, Item 4)
(Appendix B, Item 93)
Electric drill (Appendix B, Item 64)
a. Installation
1. Install new gasket (3) on flywheel housing (2).
2. Install new gasket (4) and access cover (5) on flywheel housing (2) with two screws (6).
3. Wrap male threads of two pipe plugs (1) with antiseize tape and install pipe plugs (1) on flywheel
housing (2).
NOTE
Perform steps 4 and 5 if dowel pins were removed.
4. Using drill and reaming fixture, ream two holes (13) to next oversize.
5. Install two new dowel pins (12) in cylinder block (7). Ensure new dowel pins (12) are even with or up
to 0.010 in. (0.25 mm) below surface of flywheel housing (2) when installed.
NOTE
Assistant will help with step 6.
6. Install flywheel housing (2) on dowel pins (12) and cylinder block (7) with nine new packings (8),
sixteen washers (9), new lockwashers (10), and screws (11). Finger tighten screws ( 11).
b. Alinement
1. Attach dial indicator to crankshaft ( 15) with dial indicator attachment and position plunger against
flywheel inner face (14).
2. Mark flywheel housing (2) with chalk at 3, 6, 9, and 12 o'clock positions.
3.
Rotate crankshaft (15) until dial indicator plunger is at 3 o'clock. Zero dial indicator.
4.
Turn crankshaft (15) clockwise one rotation. Record highest reading.
Turn crankshaft (15) until dial indicator is at the point where highest reading occurred. Set dial
5.
indicator to 1/2 highest reading.
6.
Using a soft-head hammer, tap on flywheel housing (2) until dial indicator reads zero. Loosen
screws (11) slightly if necessary. Finger tighten screws(11) when finished. Flywheel housing (2)
is vertically alined.