• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ALCOHOL EVAPORATOR REPLACEMENT (Contd)
SLAVE RECEPTACLE KIT REPLACEMENT (Contd)

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  1140    1141    1142    1143    1144  1145  1146    1147    1148    1149    1150  
TM 9-2320-260-20
I
14-25. SLAVE RECEPTACLE KIT REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
EQUIPMENT CONDITION
All
Parking brake set (TM 9-2320-260-10).
Battery ground cable disconnected (para. 4-48).
MATERIALS/PARTS
GENERAL SAFETY INSTRUCTIONS
Six lockwashers
Battery ground cables must be disconnected before
REFERENCES (TM)
removing slave receptacle.
TM 9-2320-260-10
TM 9-2320-260-20P
WARNING
Do not remove slave receptacle before disconnecting battery
ground cables. If energized battery cables contact cab, a direct
short will result and may cause injury to personnel.
NOTE
The slave receptacle is replaced basically the same way in vehicles
with or without an engine coolant heater installed. This procedure
covers a slave receptacle in a vehicle with an engine coolant
heater.
1. Remove nut (10), screw (18), ground cables (6), (11), and (19), and two lockwashers (9) from the right
hand frame rail (12). Discard lockwashers (9).
2. Remove nut (17), screw (13), and positive cables (14) and (16) from positive battery terminal (15).
3. Remove four nuts (20), lockwashers (21), and screws (22) from slave receptacle (1) and cab (2).
Discard lockwashers (21).
4. Remove two screws (5), clamps (4), ground cable (6), and positive cable (16) from cab back panel
support (3).
5. Remove two grommets (8) from cab floor (7) and pull slave receptacle (1) and cables (6) and (16)
from cab (2).
b. Installation
1.
Position slave receptacle (1) on cab (2).
2.
Install two grommets (8) on ground cable (6) and positive cable (16) and install grommets (8)
on cab floor (7).
3.
Install slave receptacle (1) on cab (2) with four screws (22), new lockwashers (21), and nuts (20).
4.
Install positive cables (14) and (16) on positive battery terminal (15) with screw (13) and nut (17).
Install ground cables (6), (11), and (19) on right hand frame rail (12) with screw (18), two new
5.
lockwashers (9), and nut (10).
Install ground cable (6) and positive cable (16) on cab back panel support (3) with two clamps (4)
6.
and screws (5).
14-50






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.