• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL HEATER EXHAUST TUBE REPLACEMENT
FUEL BURNING PERSONNEL HEATER HARNESS REPLACEMENT (Contd)

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  1100    1101    1102    1103    1104  1105  1106    1107    1108    1109    1110  
TM 9-2320-260-20
I
14-7. FUEL BURNING PERSONNEL HEATER HARNESS REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
REFERENCES (TM)
APPLICABLE MODELS
TM 9-2320-260-10
All
TM 9-2320-260-20P
MATERIALS/PARTS
EQUIPMENT CONDITION
Two locknuts
Parking brake set (TM 9-2320-260-10).
Lockwasher
q
q Battery ground cable disconnected (para. 4-48).
1. Disconnect harness (5) from control box (4).
2. Remove locknut (1), clamp (2), and harness (5) from stud (3) on firewall (16). Discard locknut (1).
3. Disconnect fuel pump lead (13) from wire (14).
4. Disconnect harness (5) from personnel heater (12).
5. Remove locknut (8), screw (6), lockwasher (7), and ground wire (10) from bracket (9) and frame (11).
Discard locknut (8) and lockwasher (7).
6. Remove grommet (15) and harness (5) from firewall (16).
1.
Connect harness (5) on personnel heater (12).
2.
Connect wire (14) to fuel pump lead (13).
3.
Install ground wire (10) on bracket (9) and frame (11) with new lockwasher (7), screw (6), and
new locknut (8).
4.
Insert harness (5) through hole in firewall (16).
5.
Place grommet (15) around harness (5) and install grommet (15) on firewall (16).
6.
Connect harness (5) to control box (4).
7.
Install harness (5) and clamp (2) on stud (3) on firewall (16) with new locknut (1).
14-10






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.