• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER DIVIDER CONTROL LEVER AND LINKAGE REPLACEMENT (Contd)
POWER DIVIDER-TO-TRANSFER PROPELLER SHAFT MAINTENANCE cont'd

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  1073    1074    1075    1076    1077  1078  1079    1080    1081    1082    1083  
TM 9-2320-260-20
13-56. POWER DIVIDER-TO-TRANSFER PROPELLER SHAFT MAINTENANCE
THIS TASK COVERS:
a. Removal
d. Assembly
e. Installation
b. Disassembly
c. Inspection
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM)
M816
TM 9-2320-260-10
TM 9-2320-260-20P
MATERIALS/PARTS
EQUIPMENT CONDITION
Four lockplates
Seal
Parking brake set (TM 9-2320-260-10).
1. Bend tabs on four lockplates (2) and remove eight screws (1) and four lockplates (2) from yoke (5),
shaft (10), and flanges (3) and (4). Discard lockplates (2).
2. Compress and remove propeller shafts (5) and (10) from power takeoff flange (4) and power divider
flange (3).
1.
Loosen packing retainer (9) and remove shaft (10) from yoke (5).
2. Remove packing retainer (9), split ring (8), seal (7), and split ring (6) from yoke (5). Discard seal (7).
1.
Inspect shaft (10) for bends, cracks, and breaks. Replace shaft (10) if damaged.
2. Inspect universal joint (para. 7-5).
3. Inspect yoke (5) for bends, cracks, and breaks. Replace yoke (5) if darnaged.
1. Install split ring (6), new seal (7), split ring (8), and packing retainer (9) on yoke (5).
2. Install shaft (10) in yoke (5) and tighten packing retainer (9).
1. Position propeller shaft on power divider flange (3) and power takeoff flange (4).
2.
Install four new lockplates (2) on yoke (5), shaft (10), and two flanges (3) and (4) with eight
screws (1), and bend tabs on four lockplates (2) over eight screws (1).
13-126






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.