• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VAN LIFTGATE CONTROL VALVE REPLACEMENT
VAN LIFTGATE PUMP PROPELLER SHAFT REPLACEMENT

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  1068    1069    1070    1071    1072  1073  1074    1075    1076    1077    1078  
TM 9-2320-260-20
I
13-52. VAN LIFTGATE CONTROL VALVE REPLACEMENT (Contd)
4. Install nipple (22), flow control valve (23), and two connectors (14) on tees (10).
5. Install control valve (3) on main frame mount (4) with three new lockwashers (2), screws (1),
and nuts (9).
6. Connect hydraulic hoses (7) and (5) to tee (8) and adapter (6).
7. Connect hydraulic hoses (11) and (12) to two tees (10).
8. Connect hydraulic hoses (15) and (16) to two connectors (14).
9. Connect hydraulic hoses (13) and (17) to control valve (3).
FOLLOW-ON TASKS: q Fill hydraulic system (LO 9-2320-260-12).
Install control linkage on control valve (para. 13-51).
q Operate liftgate (TM 9-2320-260-10) and check for leaks.
13-121






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.