• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WRECKER LIFT CYLINDER PACKING ADJUSTMENT
WRECKER BOOM SUPPORT REPLACEMENT (M816, M819)

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  1034    1035    1036    1037    1038  1039  1040    1041    1042    1043    1044  
TM 9-2320-260-20
13-37. WRECKER INNER BOOM ROLLER ADJUSTMENT
THIS TASK COVERS:
Adjustment
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM)
M816
TM 9-2320-260-10
TM 9-2320-260-20P
MATERIALS/PARTS
EQUIPMENT CONDITION
Sixteen lockwashers
Parking brake set (TM 9-2320-260-10).
1.
Extend inner boom (2) 12 ft (4 m) (TM 9-2320-260-10).
2.
Remove eight screws (3) and lockwashers (4) from two adjustment caps (5) (one on each side).
Discard lockwashers (4).
Turn two mounting caps (5) until inner boom (2) is parallel with outer boom (1). Turn mounting caps
3.
clockwise to lower inner boom (2) or counterclockwise to raise inner boom (2).
4.
Install eight new lockwashers (4) and screws 3) in two adjustment caps (5).
5.
Extend inner boom 15 ft (5 m) (TM 9-2320-260-10).
6.
Repeat steps 2,3, and 4 for upper boom roller (6).
13-87






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.