• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CEILING LIGHT FIXTURES MAINTENANCE (Contd)
Ceiling Light Fixture Installation

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  907    908    909    910    911  912  913    914    915    916    917  
TM 9-2320-260-20
12-45. CEILING LIGHT FIXTURES MAINTENANCE (Contd)
c. Fluorescent Light Fixture Disassembly
1. Remove four screws (12), fixture (10), and two wires (3) from light fixture (1).
2. Remove six screws (9), nuts (6), and sockets (7) from fixture (10).
NOTE
Tag wires, cables, and leads for installation.
3. Remove twelve screws (5) and wires (4) from six sockets (7).
4. Remove six starters (8) from six sockets (7).
5. Remove grommet (2) from light fixture (1).
d. Fluorescent Light Fixture Assembly
1. Install grommet (2) in light fixture (1).
2. Install six starters (8) in six sockets (7).
3. Install six sockets (7) in fixture (10) with six screws (9) and nuts (6).
4. Install twelve wires (4) in six sockets (7) with twelve screws (5).
5. Route two wires (3) through grommet (2) in light fixture (1) and install fixture (10) on light
fixture (1) with four screws (12).
e. Fluorescent Light Fixture Installation
1. Connect two wires (15) to two wires (13) with two new insulated wire splices (14).
2. Install ground wire (16) on light fixture (1) with screw (21), new lockwasher (17), and nut (18).
3. Install light fixture (2) in van ceiling (20) with twenty screws (19).
12-96






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.