• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PROPELLER SHAFTS REPLACEMENT cont'd - TM-9-2320-260-200578
PROPELLER SHAFT REPLACEMENT (TRANSFER-TO-CENTER BEARING) (Contd)

TM-9-2320-260-20 5-Ton 6x6 M809 Series Trucks (Diesel) Truck Cargo: 5-Ton 6x6 M813 (2320-00-050-8902) (EIC:BSB); Manual
Page Navigation
  557    558    559    560    561  562  563    564    565    566    567  
TM 9-2320-260-20
7-3. PROPELLER SHAFT REPLACEMENT (TRANSFER-TO-CENTER BEARING)
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM)
M812A1 W/W, M814 W/W, M814 WO/W,
TM 9-2320-260-10
M819 W/W, M820 WO/W, M820A1 WO/W,
TM 9-2320-260-20P
M820A2 WO/W, M821 W/W
EQUIPMENT CONDITION
MATERIAIS/PARTS
Parking brake set (TM 9-2320-260-10).
q
Eight locknuts
Z Center bearing removed (para. 7-6).
Remove eight locknuts (3), screws (1), and propeller input flange (4) from parking brake drum (2). Discard
locknuts (3).
Install propeller input flange (4) on parking brake drum (2) with eight screws (1) and new locknuts (3).
Tighten locknuts (3) 32-40 lb-ft (43-54 Nm).
7-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.