TM 11-7440-293-14
4-51. ROUTING AND FASTENING POWER CABLE.
This task covers:
Installation
INITIAL SETUP
Tools
Personnel Required
One mechanic
Flat-tip screwdriver
Materials/Parts
Equipment Condition
Power to circuit breaker box
Cable clamps (as required)
Flat washer (as required)
off. Power cable secured to
Power cable
90 cable connector.
ACTION
ITEM
REMARKS
LOCATION
1. Fourth screw
Screw (1)
Using flat-tip screwdriver, remove.
toward forward
Save.
wall
2.
Using flat-tip screwdriver, install.
Screw (1), flat
washer (2), cable
Steps 1 and 2 are typical for every
clamp (3) and
third screw following cable clamp
power cable (4)
until the forward wall is reached.
Pull cable tight after each cable
clamp is installed.
Power cable (4)
Do steps 1 and 2 again.
3. Along ceiling
Power cable (4)
4. Curbside angle
Using nylon ties, install.
and nylon ties (5)
bracket connect.
ing ceiling to
lower ledge
Remove.
Screw (6)
5. Curbside, forward
Save.
overhand ledge
4-98