TM 11-7440-293-14
4-3. UNPACKING.
This task covers:
Unpacking
INITIAL SETUP
Personnel Required
Tools
One mechanic
Pliers
Nail puller
Equipment Condition
Shears
Pocket knife
Equipment crated.
Materials/Parts
None
ACTION
REMARKS
ITEM
LOCATION
WARNING
Stand to side of each packing band when cutting.
NOTE
Move crated equipment to site of installation. Save cartons,
fillers, and blocking for future use as packing for
storage.
Using shears, cut.
Packing band (1)
1. Wooden crate
Using nail puller, remove.
2. Top cover
Remove.
Top cover (3)
3. Wooden crate
Using nail puller, remove.
4. Side cover
Remove.
Side cover (5)
5. Wooden crate
If packed for overseas, remove
moisture proof cover.
NOTE
Remove cartons from crate and carefully remove components.
Some parts are secured to sides of wooden crate. Using
pliers, remove.
4-2